Design and demolition
Starting before design can turn unknowns into unsafe or expensive decisions.
Structural work changes the conditions other trades rely on. Investigation and design must inform construction; services and finishes must then be coordinated around the altered fabric.
Use available records and proportionate inspection to understand walls, floors, roof relationships, services and previous alterations.
Structural assessment and design information should define the intended alteration before the builder prices or starts it.
The project team—not the homeowner—should decide safe sequencing, access and temporary stability arrangements.
Electrical, plumbing, heating, drainage and ventilation routes may need alteration and testing.
Inspection opportunities, fire or acoustic details where applicable, making good and documentation come before decoration is treated as complete.
Starting before design can turn unknowns into unsafe or expensive decisions.
A beam, opening or floor change may conflict with pipes, cables or ventilation routes.
Hidden conditions need an agreed recording and variation pathway.
Closing work too early can remove inspection access or conceal incomplete interfaces.
When concealed conditions differ from records, pause the affected decision, document the finding and obtain appropriate advice. A revised specification should state the consequence for cost, programme and other trades.
The DC Trades variations guide explains why approval and records matter, while the pre-renovation electrical guide shows how early access can reduce later disruption.
A builder constructs from the agreed information; a structural engineer may assess and design; an architect or other designer may coordinate spatial and technical information; specialist trades own their systems. The exact team depends on the project, but responsibilities should not be left implicit.
The construction scope should be based on appropriate completed information. Project-specific professionals should control sequencing.
Competent project professionals working from the structure and design—not a homeowner following generic instructions.
The trades and designer should coordinate a revised route and record any change to scope, cost or documentation.