Move from building design to fitted room
- 1
Coordinate layout and structure
Openings, walls, ceilings and intended kitchen use must agree.
- 2
Set drainage and water strategy
Routes and levels should be assessed before slabs and finishes restrict access.
- 3
Design electrical and lighting scope
Appliances, sockets, controls and lighting require actual product and layout information.
- 4
Plan extraction and ventilation
Route, outlet and building interfaces need early coordination.
- 5
Sequence cabinets and finishes
Floors, walls, units, worktops, appliances and making good need defined responsibilities.
Connect to the wider extension system
The extension coordination guide brings together foundations, openings, roof, drainage and services. The extension electrical guide covers circuits, loads, first-stage work and documentation.
A kitchen designer’s layout is not automatically a complete building-services design. Builder, plumber, electrician, fitter and other specialists must coordinate their information.
Late changes and their consequences
| Change | Possible knock-on effect | Evidence needed |
|---|---|---|
| Move sink | Waste fall, supply, cabinets and floor access | Revised route and making-good scope. |
| Change appliance | Electrical or other service requirement and ventilation | Manufacturer information and specialist assessment. |
| Alter island | Floor services, lighting, circulation and worktop | Coordinated drawing and variation. |
| Change extraction | Route, external outlet and building fabric | Revised design and trade responsibility. |
Questions homeowners often ask
When should the kitchen layout be fixed?
Early enough to coordinate drainage, water, electrical, extraction, walls and openings before concealed work closes.
Can late changes affect several trades?
Yes. One position change can alter services, cabinetry, finishes and programme.
Does a kitchen plan replace construction drawings?
No. Each form of information has a different project purpose.