Create a scope comparison
| Heading | What should be stated |
|---|---|
| Diagnosis | What evidence identifies the defect and location? |
| Investigation | Are surveys, tests or opening up included? |
| Repair | Which pipe, fitting, drain section or component will be renewed and with what material? |
| Access | Panels, ceilings, floors, excavation, permits or specialist equipment. |
| Testing | How will restored supply, flow or drainage be checked? |
| Reinstatement | Who closes floors, ceilings, paving, landscaping or decoration? |
| Commercial terms | Waste, VAT where applicable, payments, exclusions and documents. |
Unknown work should be labelled
Concealed pipes and underground drains can reveal additional defects. Ask what is fixed, provisional or excluded; what evidence will be shown; and how a variation is approved before cost grows.
Specialist equipment must have a purpose
Camera inspection, tracing, pumping or excavation may be justified by the symptom and system. Do not compare equipment lists as quality badges—compare what question each method answers.
Guarantees only count when offered
Read any actual written terms: provider, covered work, duration, exclusions and claims route. Do not infer a guarantee from verification or general marketing language.
Completion evidence
Depending on the work, useful completion records may include photographs, test or survey findings, invoices, product information, waste documentation and the agreed reinstatement. Specify these before the final payment stage.
Questions homeowners often ask
Why do two drainage quotes have different excavation areas?
They may rely on different location evidence or repair methods. Ask each contractor to explain the diagnosed position and uncertainty.
Should reinstatement be included?
It may be included or separate, but the quotation should say who restores every disturbed surface.
Can the price change after opening up?
Yes, concealed conditions can alter scope. The variation process should define evidence, approval and price consequences.
Follow the evidence
Use the general specification and payment guides to compare commercial terms, then check contractor evidence.