Normalise every quotation
- 1
Issue the same layout and products
Dimensions, models and supply responsibility must match.
- 2
Compare each trade package
Plumbing, electrical, carpentry, tiling, ventilation and building work should be visible.
- 3
Compare finishes and making good
Floors, walls, decoration, seals, waste and cleaning alter completion.
- 4
Expose assumptions
Access, hidden damage, provisional items and exclusions need written treatment.
- 5
Compare programme and payments
Sequence, milestones, VAT and variation approval affect the real contract.
Room-by-room scope matrix
| Heading | Kitchen examples | Bathroom examples |
|---|---|---|
| Removal | Units, worktops, appliances and services | Sanitaryware, tiles, screens and floors |
| Installation | Cabinets, worktops and appliances | Bath, shower, basin, toilet and furniture |
| Specialist work | Plumbing, electrical and extraction | Plumbing, drainage, electrical and ventilation |
| Finishes | Floors, walls, splashbacks and decoration | Waterproofing system, tiling, seals and decoration |
| Unknowns | Wall, floor and service condition | Leaks, movement, moisture and subfloor condition |
Connect general quotation discipline
The general quote-comparison guide explains why scope comes before bottom-line price. The payments and variations guide covers milestones and records without inventing universal percentages.
Opening-up may reveal conditions no responsible contractor could price precisely in advance. Ask how evidence becomes a revised specification, cost and approval.
Questions homeowners often ask
Why do refurbishment quotes vary widely?
They may include different trades, products, finishes, access and hidden-condition allowances.
Should a deposit always be the same percentage?
No. Project scale, materials and contract structure influence payment arrangements.
What is the biggest comparison mistake?
Comparing totals before checking that the scopes and exclusions match.