Put every quotation on the same footing
- 1
Define the problem or project
State the symptom, finding, rooms, intended use and relevant existing reports.
- 2
Compare proposed work
Check circuits, equipment, accessories, routes, removals and interfaces with other trades.
- 3
Compare completion evidence
Testing, applicable certification or documentation, labels, handover and snagging should be explicit.
- 4
Compare uncertainty
Provisional work, exclusions, opening-up and approval of additional defects need a written route.
Specification comparison checklist
| Heading | What to compare | Common source of price difference |
|---|---|---|
| Scope | Exact circuits, points, equipment and remedial work | One quote answers the whole brief; another prices only the visible symptom. |
| Access and making good | Lifting, chasing, fire stopping, plastering and decoration responsibilities | The electrician may exclude building finishes. |
| Testing and records | Included tests and documents applicable to the work | A headline price may omit completion evidence. |
| Equipment | Manufacturer/model or performance specification where relevant | Allowances can conceal materially different products. |
| VAT and waste | Whether applicable VAT and disposal are included | Bottom lines may not use the same basis. |
| Variations | How hidden defects and requested changes are approved | An initially low quote may leave more work provisional. |
Electrical work inside a larger project
For an extension or bathroom, electrical scope depends on the builder, plumber and finishing sequence. Quotations should identify who creates routes, protects finished areas, makes good and provides final records. The general building quotation guide applies the same principle: compare specification before price.
Payment arrangements vary legitimately with scale, materials and contract structure. The DC Trades payments and variations guide explains evidence, milestones and approval without inventing universal percentages.
When investigation must come first
Some fault work cannot be specified fully until testing or access establishes the defect. In that case, compare the investigation stage itself: attendance, scope, reporting, what immediate repair may be authorised, and how a separate remedial quotation will follow. Honest uncertainty is more useful than false precision.
Questions homeowners often ask
Why can electrical quotes differ so much?
They may include different circuits, equipment, access, making good, testing, documentation, VAT and provisional work.
Should I always choose a fixed price?
Not every fault can be fully specified before investigation. What matters is that the stages, assumptions and approval process are clear.
Are staged payments always required?
No single structure suits every project. Scale, materials and contract terms influence arrangements.