Drainage
Existing routes, diversions and final surface water.
Groundworks translate the extension design into the site. Access, ground evidence, services, drainage, foundations, spoil and neighbouring conditions must be resolved before excavation becomes the project plan.
Foundation and drainage work should follow appropriate project evidence.
Plant, deliveries, occupied-house routes and buried utilities affect method.
Temporary storage, removal and ground uncertainty belong in the quote.
Foundations, drainage and services require their project-specific checks.
Levels, paths, boundaries and landscaping should connect to the finished extension.
The foundation evidence guide explains records, ground history and site investigation. The extension coordination record links foundations to roof, plumbing and electrics.
Unknown ground and concealed services can create legitimate variations. The original quotation should state assumptions and approval routes rather than pretending all conditions are visible.
Existing routes, diversions and final surface water.
Boundaries, access, lower ground and temporary disruption.
Open excavation, mud and temporary access affect sequence.
Reinstatement may be a separate scope unless explicitly included.
Some conditions may remain concealed; assumptions and provisional items should be explicit.
Responsibilities depend on the project team, design and contract and should be written.
No. Check exactly which paths, lawns, walls and boundaries will be restored.