Coordinate the project as one sequence
- 1
Understand the existing house
Record structure, levels, services, drainage, roof form, access and previous alterations.
- 2
Complete design and scope
Align architectural intent, structural information, junction details and service requirements before quotations are compared.
- 3
Plan ground and shell work
Foundations, drainage, access, spoil, materials and weather protection affect early sequencing.
- 4
Coordinate first fix
Plumbing, electrical and other services need agreed routes before walls and floors close.
- 5
Complete junctions and finishes
Roofing, openings, insulation, internal making good, testing and handover define the finished outcome.
Critical interfaces
| Interface | What must be coordinated | What can go wrong in the quotation |
|---|---|---|
| Old and new foundations | Levels, design and construction sequence | Assuming existing depth proves the new design. |
| Opening into the house | Structural information, services and making good | Pricing demolition without finished repair. |
| Roof junction | Falls, coverings, flashings and water path | Treating roofing as a later undefined extra. |
| Drainage and plumbing | Routes, levels, connections and testing | Leaving diversions or reinstatement provisional. |
| Electrical | Loads, circuits, positions and documentation | Counting points without defining the design. |
Connect the specialist knowledge records
Foundation uncertainty is covered in the filled-ground extension guide. The roof-flashing record explains water paths at junctions, while electrical planning during an extension sets out circuit, first-fix and documentation questions.
Drainage may require a plumber, drainage contractor or groundworker depending on the system and task; the DC Trades responsibility guide distinguishes those roles.
Define completion before work starts
Agree what inspections, testing, certificates or other records are applicable; who makes good the existing house; what finishes are included; how snagging works; and what weather protection applies during openings. “Extension complete” needs a shared definition.
Questions homeowners often ask
Why can an extension quote change after work begins?
Concealed construction or ground conditions may differ from available information. The quote should define assumptions and the variation process.
Should roofing and services be quoted separately?
They may be separate packages, but their interfaces and responsibilities still need one coordinated programme.
Does the existing foundation determine the new one?
No. It is evidence for assessment, not a universal design instruction.